  • How Much Deck Stain or Sealer Do I Need? Gallons per Coat

    Quick answer: deck sealer or stain is bought by the gallon, and one gallon usually covers roughly 150 to 300 square feet per coat. Gallons needed = deck area × coats ÷ coverage per gallon. Always check the coverage printed on the can.

    Example: a 12 ft by 12 ft deck, two coats

    • Deck surface: 12 × 12 = 144 sq ft
    • Two coats: 144 × 2 = 288 sq ft to cover
    • Coverage assumed: 200 sq ft per gallon
    • Gallons: 288 ÷ 200 = 1.44, so buy 2 gallons

    Do not forget

    • Railings, stairs and balusters add area. Measure them separately and add them.
    • Rough or weathered wood soaks up more, so coverage can fall near the low end.
    • Many products call for one coat only, so read the label.

    Quick table for a 200 sq ft per gallon product

    Deck size Area Two coats Gallons to buy
    10 × 10 ft 100 sq ft 200 sq ft 1
    12 × 12 ft 144 sq ft 288 sq ft 2
    16 × 20 ft 320 sq ft 640 sq ft 4 (3.2 rounded up)

    Building the deck first? See how many deck boards for a 12×12 deck.

    Prepare the wood first

    Stain and sealer only work well on clean, dry wood. Before you buy, plan for these steps:

    1. Sweep the deck and clear out the gaps between boards.
    2. Clean with a deck cleaner to remove dirt, mildew and gray, weathered fibers. Strip old finish if it is peeling.
    3. Let the wood dry fully, often 24 to 48 hours after cleaning or rain.
    4. Do a water test: sprinkle a little water on the boards. If it soaks in, the wood is ready. If it beads up, wait longer or clean again.
    5. New pressure-treated lumber may need to dry out before finishing. Follow the product label for how long to wait.

    Measuring stairs and railings

    Railings, stairs and balusters can add a surprising amount of surface. Use these rough methods and add the results to your deck area:

    • Stairs: tread width × tread depth × number of treads, plus the risers if you are staining them.
    • Solid railings: length × height × 2 for both sides.
    • Baluster railings: a common shortcut is to treat the railing as a solid panel, length × height, which roughly allows for all four sides of each baluster.

    For example, 30 ft of railing at 3 ft high counts as about 90 sq ft. Two coats would add 180 sq ft of coverage, or about another gallon at 200 sq ft per gallon.

    Transparent, semi-transparent or solid stain?

    • Clear sealer or transparent stain: shows the most wood grain, but usually needs reapplying most often.
    • Semi-transparent stain: adds color while letting grain show through. A popular middle ground.
    • Solid stain: looks more like paint, hides wear and usually lasts longest, but hides the grain.

    Coverage is different for each product, so always use the figure on the can for your final calculation.

    When to apply

    Choose a dry spell with mild temperatures. Many products recommend roughly 50°F to 90°F and no rain for at least a day after application. Avoid staining in strong direct sun, which can make the finish dry too fast and leave lap marks. Work a few boards at a time, along their full length.

    Common questions

    How many gallons of stain for a 12×12 deck?

    About 1 to 2 gallons, depending on coverage and the number of coats. The example above needs 2 gallons for two coats.

    Is one coat of deck stain enough?

    Some products are designed for one coat, while others need two. Check the label, because an extra coat on a one-coat product can cause peeling.

    How often should I re-stain my deck?

    It depends on the product, climate and sun exposure. Transparent finishes may need attention every year or two, while solid stains often last longer.

    Estimates only. Always follow the product label and local guidance.

    Related: the DIY Project Budget & Materials Planner turns your measurements into quantities, costs and a shopping list.

  • How Much Mulch Do I Need? (Easy Formula, Chart & Bag Calculator)

    Quick answer: Multiply your bed’s area in square feet by the mulch depth in inches, then divide by 324. The result is the number of cubic yards you need.

    Cubic yards = square feet × depth (inches) ÷ 324

    For example, a 200 sq ft bed at 3 inches deep needs 200 × 3 ÷ 324 = 1.85 cubic yards, or about 25 bags of 2 cu ft.

    Why 324?

    One cubic yard is 27 cubic feet. Spread 1 inch deep, it covers 27 × 12 = 324 square feet. So dividing by 324 converts square feet and inches into cubic yards.

    Step-by-step

    1. Measure your beds. For rectangles: length × width. For circles: 3.14 × radius × radius. For odd shapes, break them into rectangles and add them up.
    2. Choose a depth. Most beds need 2–3 inches (see the chart below).
    3. Calculate cubic yards with the formula above.
    4. Convert to bags if buying bagged mulch: cubic yards × 27 ÷ bag size (cu ft).
    5. Add 5–10% for settling and uneven ground.

    Mulch coverage chart: 1 cubic yard

    Depth Area covered by 1 cu yd
    1 inch 324 sq ft
    2 inches 162 sq ft
    3 inches 108 sq ft
    4 inches 81 sq ft

    Bags of mulch needed (2 cu ft bags)

    Bed area 2 in deep 3 in deep
    50 sq ft 5 bags 7 bags
    100 sq ft 9 bags 13 bags
    200 sq ft 17 bags 25 bags
    300 sq ft 25 bags 38 bags
    500 sq ft 42 bags 63 bags

    A 2 cu ft bag at 2 inches covers 12 sq ft; at 3 inches it covers 8 sq ft. A 3 cu ft bag covers 50% more.

    How deep should mulch be?

    • Flower beds and perennials: 2–3 inches.
    • Vegetable gardens (straw or fine mulch): 2–3 inches.
    • Around trees and shrubs: 2–4 inches, keeping mulch 3–6 inches away from trunks. Avoid “mulch volcanoes”, which trap moisture against bark.
    • Paths and play areas: 3–4 inches for wood chips; playgrounds often need much deeper for fall protection.
    • Topping up existing mulch: often just 1 inch is enough.

    Too little mulch will not block weeds. More than about 4 inches can starve roots of oxygen.

    Bulk vs bagged mulch

    Bagged Bulk
    Best for Under 2–3 cubic yards Larger projects
    Typical price About $3–$7 per 2 cu ft bag About $30–$60 per cu yd, plus delivery
    Convenience Easy to carry, store, spread in small beds Delivered as a pile; needs a wheelbarrow
    Waste Plastic bags No packaging

    One cubic yard equals 13.5 bags of 2 cu ft. If bags cost $4, one yard bagged costs about $54, so bulk often wins above 2–3 yards once delivery is included.

    Worked example

    You have two beds:

    • Front bed: 20 ft × 4 ft = 80 sq ft
    • Circular tree ring: radius 3 ft = 3.14 × 3 × 3 ≈ 28 sq ft

    Total = 108 sq ft at 3 inches: 108 × 3 ÷ 324 = 1 cubic yard. In 2 cu ft bags: 27 ÷ 2 = 13.5, so buy 14 bags (15 with a little extra).

    Choosing a mulch type

    • Shredded hardwood: stays in place on slopes, breaks down to improve soil.
    • Pine bark nuggets: long-lasting, good for acid-loving plants, but can float in heavy rain.
    • Cedar or cypress: pleasant scent and slow to decompose.
    • Pine straw: light, cheap, popular in the US South.
    • Dyed mulch: bold color but fades; choose products certified free of treated wood.
    • Rubber or stone: long-lasting but does not feed the soil and can heat up in summer.

    How to spread mulch the right way

    1. Weed first. Pull weeds and remove debris so mulch does not trap them.
    2. Edge the bed. A clean 2–3 inch edge keeps mulch in place and looks neat.
    3. Water the soil. Mulch locks in moisture, so start with damp soil.
    4. Optional barrier. Lay cardboard or newspaper for heavy weed areas. Avoid plastic sheeting, which blocks water and air.
    5. Dump in small piles. Spread with a rake or by hand to an even depth.
    6. Keep it off stems and trunks. Leave a small gap around plants.
    7. Water lightly to settle the mulch in place.

    Common mulching mistakes

    • Piling mulch against tree trunks, which invites rot and pests.
    • Adding new mulch on top every year without checking the depth, until it is 6+ inches thick.
    • Using fresh wood chips mixed into soil, which can temporarily tie up nitrogen. Keep chips on the surface.
    • Buying by the bag without doing the math, then making several extra store trips.

    Frequently asked questions

    How many bags of mulch are in a yard?

    13.5 bags of 2 cu ft, or 9 bags of 3 cu ft.

    How often should I replace mulch?

    Top up organic mulch every year to maintain 2–3 inches. Fully replace it every 3–5 years or when it becomes matted.

    When is the best time to mulch?

    Mid to late spring, after the soil warms, and again in fall to protect roots over winter.

    Bottom line

    Use square feet × depth ÷ 324 for cubic yards, then convert to bags if needed. Aim for 2–3 inches in most beds and add a little extra for settling. Try DIYMeter’s free gravel and mulch calculator for an instant answer.

    Prices are typical US ranges and vary by region and season.

  • How Many Square Feet Is a 12×12 Room? (Plus Flooring, Paint & Tile Math)

    Quick answer: A 12 × 12 room is 144 square feet. That equals 16 square yards or about 13.4 square meters.

    Knowing the floor area is only the first step. Below, you will see how to use that number to estimate flooring, carpet, tile and paint for a 12 × 12 room, including the extra material you should buy for cuts and waste.

    How to calculate square footage

    Square feet = length (ft) × width (ft)

    12 ft × 12 ft = 144 sq ft.

    If your measurements include inches, convert them to feet first. For example, 12 ft 6 in = 12.5 ft. A 12 ft 6 in × 12 ft room = 12.5 × 12 = 150 sq ft.

    Quick conversions for a 12×12 room

    Unit Value
    Square feet 144 sq ft
    Square yards 16 sq yd (144 ÷ 9)
    Square meters 13.38 m² (144 × 0.0929)
    Perimeter 48 ft
    Wall area (8 ft ceiling) 384 sq ft (before doors/windows)

    Is a 12×12 room big?

    A 12 × 12 room is a comfortable average bedroom in the US. It fits a queen bed with nightstands and a dresser, or works well as a home office, nursery or guest room. Most building codes require a bedroom to be at least 70 sq ft, so 144 sq ft is roughly double the minimum.

    Flooring for a 12×12 room

    Always add a waste factor for cuts, mistakes and future repairs:

    Flooring type Waste factor Buy at least
    Laminate / vinyl plank (straight lay) 10% ≈ 159 sq ft
    Hardwood (straight lay) 10% ≈ 159 sq ft
    Diagonal or herringbone pattern 15–20% 166 – 173 sq ft
    Ceramic / porcelain tile 10–15% 159 – 166 sq ft

    Flooring is sold by the box. If one box covers 22 sq ft, you need 159 ÷ 22 = 7.2, so buy 8 boxes.

    Carpet for a 12×12 room

    Carpet usually comes in 12-ft-wide rolls, which makes a 12 × 12 room easy: one piece 12 ft long, or 16 sq yd with no seams. Many installers still add about 10% for trimming, so plan on 17–18 sq yd.

    Tile for a 12×12 room

    • 12 × 12 in tiles: each covers 1 sq ft. 144 tiles + 10% = 159 tiles.
    • 12 × 24 in tiles: each covers 2 sq ft. 72 tiles + 10% = 80 tiles.
    • 18 × 18 in tiles: each covers 2.25 sq ft. 64 tiles + 10% = 71 tiles.

    Paint for a 12×12 room

    1. Wall area: 48 ft perimeter × 8 ft = 384 sq ft.
    2. Subtract one door (≈ 20 sq ft) and one window (≈ 15 sq ft) = 349 sq ft.
    3. At 350–400 sq ft per gallon, you need about 1 gallon per coat.
    4. Two coats = about 2 gallons. The ceiling (144 sq ft) needs roughly 1 more gallon for two coats.

    See our guide on how much it costs to paint a room for a full budget.

    Baseboard and trim

    Baseboard follows the perimeter: 48 ft, minus door openings (about 3 ft each). One door = 45 ft. Add 10% for corner cuts, so buy about 50 linear feet.

    Measuring irregular rooms

    Not every room is a perfect square. For an L-shaped room, split it into rectangles, calculate each one, then add them together. For example, a 12 × 12 area plus a 4 × 6 closet nook = 144 + 24 = 168 sq ft.

    Tips for accurate measurements

    • Measure wall to wall at floor level, not along baseboards.
    • Measure twice, in two places, because walls are rarely perfectly straight.
    • Round up to the next half foot when buying materials.
    • Keep one extra box of flooring or tile for future repairs; dye lots can change.

    Budget example: renovating a 12×12 bedroom

    Here is a rough US materials budget using the quantities above:

    Item Quantity Approx. cost
    Luxury vinyl plank ($2.50–$4/sq ft) 159 sq ft $400 – $640
    Underlayment 159 sq ft $50 – $100
    Wall paint 2 gallons $60 – $100
    Ceiling paint 1 gallon $25 – $40
    Baseboard 50 linear ft $50 – $120
    Total materials $585 – $1,000

    Professional installation would add labor on top, often $2–$5 per sq ft for flooring alone. Doing the painting yourself and hiring out only the flooring is a common way to save.

    Common mistakes

    • Forgetting the closet or doorway threshold when ordering flooring.
    • Skipping the waste factor and running one box short mid-project.
    • Using floor area instead of wall area to estimate paint.
    • Not letting flooring acclimate in the room for 24–48 hours before installation.

    Frequently asked questions

    How many square feet is a 10×12 room?

    120 sq ft. A 12×14 room is 168 sq ft, and a 12×15 room is 180 sq ft.

    How many 12×12 rooms make 1,000 square feet?

    About 7 (1,000 ÷ 144 ≈ 6.9).

    Does square footage include closets?

    For flooring, yes, include any closet you will cover. For home listings, rules vary by area.

    Bottom line

    A 12 × 12 room is 144 sq ft. Add 10–15% for flooring and tile, about 16 sq yd for carpet, and roughly 2 gallons of paint for the walls. Use DIYMeter’s free calculators to get exact amounts for your project.

  • How Much Does It Cost to Paint a Room? (2026 DIY vs Pro Prices)

    Quick answer: Hiring a professional to paint an average room in the US costs about $1,100, with most projects falling between $200 and $2,000. Painting it yourself usually costs $100–$300 in paint and supplies.

    Your exact price depends on room size, ceiling height, paint quality, prep work and whether you include ceilings and trim. Here is how to estimate it.

    Cost to paint a room by size (professional)

    Painters typically charge $2–$6 per square foot of floor area for walls, including labor and paint.

    Room size Floor area Estimated pro cost
    10 × 10 ft 100 sq ft $200 – $600
    10 × 12 ft 120 sq ft $240 – $720
    12 × 12 ft 144 sq ft $290 – $870
    14 × 16 ft 224 sq ft $450 – $1,350
    16 × 16 ft 256 sq ft $515 – $1,540

    Add roughly $1–$6 per sq ft for ceilings and $1–$3 per linear foot for trim and baseboards.

    DIY cost to paint a room

    For a typical 12 × 12 bedroom with 8-foot ceilings:

    Item Approx. cost
    Paint, 2 gallons (mid-range, $30–$50/gal) $60 – $100
    Primer, 1 gallon (if needed) $15 – $25
    Roller frame, covers and tray $15 – $30
    Angled brush (2–2.5 in) $8 – $20
    Painter’s tape and drop cloths $15 – $30
    Spackle, sandpaper, caulk $10 – $20
    Total $125 – $225

    Once you own the tools, your next room costs mostly just paint.

    How to estimate how much paint you need

    1. Measure the perimeter: add the lengths of all walls. A 12 × 12 room = 48 ft.
    2. Multiply by ceiling height: 48 × 8 = 384 sq ft of wall.
    3. Subtract openings: about 20 sq ft per door and 15 sq ft per window. One door and one window: 384 − 35 = 349 sq ft.
    4. Divide by coverage: one gallon covers about 350–400 sq ft. 349 ÷ 350 ≈ 1 gallon per coat.
    5. Multiply by coats: two coats = about 2 gallons.

    Use the free paint calculator on DIYMeter to do this instantly for any room.

    What affects the price?

    Paint quality

    Paint ranges from about $20 to $70 per gallon for most brands, with designer lines over $100. Better paint usually covers in fewer coats, which can offset the price.

    Finish

    Flat and matte hide flaws and suit ceilings and bedrooms. Eggshell and satin are easier to clean for living areas. Semi-gloss suits bathrooms, kitchens and trim.

    Color change

    Going from dark to light, or covering bright colors, often needs primer and an extra coat.

    Prep work

    Repairing cracks, filling nail holes, removing wallpaper or treating stains adds time and cost. Wallpaper removal alone can add hundreds of dollars.

    Ceiling height and access

    Vaulted ceilings, stairwells and rooms needing ladders or scaffolding cost more.

    Location

    Labor rates are higher in large metro areas. Painters typically charge $20–$50 per hour.

    DIY vs hiring a pro

    DIY Professional
    Cost (12 × 12 room) $125 – $225 $290 – $870+
    Time 1–2 days Often 1 day
    Finish quality Depends on skill Clean lines, consistent coverage
    Best for Simple rooms, standard ceilings High ceilings, dark-to-light changes, tight schedules

    Money-saving tips

    • Do the prep yourself (moving furniture, patching, taping) and ask the painter for a reduced quote.
    • Paint several rooms at once; many painters discount larger jobs.
    • Choose paint-and-primer products when covering similar colors.
    • Buy paint in 5-gallon buckets for large projects; it is often cheaper per gallon.
    • Get at least three written quotes and confirm what is included (ceilings, trim, number of coats).

    Step-by-step: painting a room yourself

    1. Clear and protect. Move furniture to the center, cover it, and lay drop cloths along the walls.
    2. Clean and repair. Wipe walls with a damp sponge, fill nail holes with spackle, and lightly sand once dry.
    3. Tape. Apply painter’s tape along trim, ceilings and outlets. Remove outlet and switch covers.
    4. Prime if needed. Use primer over patches, stains, bare drywall or big color changes.
    5. Cut in. Use an angled brush to paint a 2–3 inch band along corners, ceiling lines and trim.
    6. Roll. Work in 3 × 3 ft sections in a “W” pattern, keeping a wet edge to avoid lap marks.
    7. Second coat. Wait for the time on the can (often 2–4 hours), then repeat.
    8. Finish. Pull tape while the last coat is slightly wet for crisp lines, then replace covers.

    Hidden costs to plan for

    • Moving heavy furniture, which some painters charge extra for.
    • Drywall repair for cracks or water damage.
    • Lead-safe practices in homes built before 1978, which require certified contractors for disturbing old paint.
    • Painting doors and window frames, often priced per item ($50–$150 each).

    Frequently asked questions

    How long does it take to paint a room?

    A pro can usually paint a standard bedroom in 4–8 hours. DIYers should plan a full day, plus drying time between coats.

    Do I need two coats of paint?

    Usually yes, for even color and durability, especially when changing colors.

    Is it cheaper to paint walls and ceiling the same color?

    It can save time on cutting in, but ceilings normally use flat ceiling paint, so you will still buy separate products.

    Bottom line

    Expect around $1,100 for a pro on an average room, or about $125–$225 to do a 12 × 12 room yourself. Measure first, calculate your gallons, and compare quotes so you know a fair price before you start.

    Prices are US national estimates for 2026 and vary by location and project.

  • How Much Sand and Gravel Base for a Paver Patio? Depths and Volumes

    Quick answer: a paver patio needs two layers of material under the stones: a compacted gravel base (usually 4 to 6 inches) and a 1 inch bedding layer of sand. Volume = area × depth in feet, divided by 27 for cubic yards.

    To count the pavers themselves, see how many pavers for a 10×10 patio. For more on base stone, see how much gravel you need.

    Example: a 10 ft by 10 ft patio

    Layer Depth Cubic feet Cubic yards
    Gravel base 4 in (0.333 ft) 33.3 1.23
    Bedding sand 1 in (0.083 ft) 8.3 0.31

    Area: 10 × 10 = 100 sq ft. Gravel: 100 × 0.333 = 33.3 cubic feet, and 33.3 ÷ 27 = 1.23 cubic yards. Sand: 100 × 0.083 = 8.3 cubic feet, and 8.3 ÷ 27 = 0.31 cubic yards.

    Add an allowance

    Compaction and uneven ground use extra material. Add about 10% to 15%: gravel 1.23 × 1.1 = 1.36 cubic yards, sand 0.31 × 1.1 = 0.34 cubic yards.

    Tips

    • Compact the base in layers of no more than about 2 inches at a time.
    • Screed the sand level and do not compact it before laying the pavers.
    • Depths vary with soil and use, so check your paver maker’s guidance, and use thicker bases for driveways.

    Related: the DIY Project Budget & Materials Planner turns your measurements into quantities, costs and a shopping list.

  • How Much Flooring Do I Need? Square Footage, Waste and Boxes

    Flooring is sold in boxes, not square feet, and the box count is where most people get caught out. Measure the room, add an allowance for cuts and mistakes, then round up to whole boxes.

    Step 1: measure the room

    For a rectangular room, multiply length by width. A 14 ft x 18 ft room is 252 square feet. In metric, a room 4.2 m x 5.5 m is 23.1 square metres.

    For an L-shaped or irregular room, split it into rectangles, work out each area and add them together. Subtract areas that will not be floored, such as a built-in cupboard, but not a small island or a doorway.

    Step 2: add a waste allowance

    You will cut boards to fit walls and around corners, and some pieces will be damaged or unusable. Typical allowances are:

    • 5 to 10 percent for a straightforward straight lay in a simple room
    • 10 to 15 percent for diagonal layouts, herringbone or rooms with many corners

    Using 10 percent: 252 x 1.10 = 277.2 square feet. In metric: 23.1 x 1.10 = 25.4 square metres.

    Step 3: divide by the coverage per box

    The coverage is printed on the box. Divide your area, including waste, by that figure and always round up.

    • Imperial example: 277.2 / 22.5 square feet per box = 12.3, so buy 13 boxes
    • Metric example: 25.4 / 2.2 square metres per pack = 11.5, so buy 12 packs

    Step 4: price it

    Multiply the number of boxes by the price per box. In the imperial example, 13 boxes at 45 dollars is 585 dollars before underlay, trim and fitting. Remember to include underlay, skirting or baseboard, transition strips and adhesive or fixings if your floor needs them.

    Tips that save money and trouble

    • Buy from the same batch. Colour can vary slightly between production runs, so buy all boxes together.
    • Keep a spare box. If a board is damaged years later, a matching one is hard to find.
    • Let it acclimatise. Many floors need to sit in the room for a day or more before fitting. Check the manufacturer’s instructions.
    • Measure twice. Walls are rarely perfectly square, so measure the longest length and widest width.

    Use the calculator

    Our free flooring calculator does these steps for you in feet or metres and gives you a shopping list. To keep the whole renovation in one place, the DIY Project Budget and Materials Planner adds a budget tracker and project timeline.

    These are planning estimates. Check box coverage and installation requirements with your supplier and the manufacturer before you buy.

  • How Much Concrete Do I Need for a Slab? Cubic Yards and Cubic Metres

    Ordering too little concrete means a cold joint halfway through the pour. Ordering too much costs money and leaves you with a pile to dispose of. The good news is that the maths is simple: length times width times thickness, converted to the unit your supplier sells.

    The basic formula

    Volume = length x width x thickness. Measure everything in the same unit before you multiply.

    In feet and inches (cubic yards)

    Concrete in the US is sold by the cubic yard. One cubic yard is 27 cubic feet. Convert the thickness from inches to feet by dividing by 12, multiply, then divide by 27.

    Example: a 10 ft x 10 ft patio slab, 4 inches thick.

    • Thickness in feet: 4 / 12 = 0.333 ft
    • Volume: 10 x 10 x 0.333 = 33.3 cubic feet
    • In cubic yards: 33.3 / 27 = 1.23 cubic yards

    In metres (cubic metres)

    Elsewhere concrete is sold by the cubic metre. Convert millimetres to metres by dividing by 1,000.

    Example: a 3 m x 3 m slab, 100 mm thick.

    • Volume: 3 x 3 x 0.1 = 0.9 cubic metres

    Add a waste allowance

    Ground is rarely perfectly level, forms can bow and some concrete is lost when you pour. Adding about 10 percent is a common allowance. For the imperial example, 1.23 x 1.10 = 1.36 cubic yards. For the metric example, 0.9 x 1.10 = 0.99, so you would order 1 cubic metre. Ready-mix suppliers often have a minimum load, so ask about it.

    If you are mixing bagged concrete

    Check the yield printed on the bag. As a typical guide, an 80 lb bag yields about 0.6 cubic feet and a 60 lb bag about 0.45 cubic feet. For the 33.3 cubic feet slab above:

    • 80 lb bags: 33.3 / 0.6 = about 56 bags, or about 61 with a 10 percent allowance
    • 60 lb bags: 33.3 / 0.45 = about 74 bags

    That is a lot of bags to mix by hand, which is why larger slabs usually use ready-mix delivered by truck.

    How thick should a slab be?

    A typical residential patio or walkway slab is about 4 inches (100 mm). Driveways and areas carrying vehicles are usually thicker, often 5 to 6 inches or more, and sometimes reinforced. Requirements depend on your soil, climate and local building rules, so check with your local authority before you pour.

    Do not forget the base

    Most slabs sit on a compacted gravel sub-base, commonly about 4 inches. Calculate the gravel the same way, length x width x depth, and order it separately.

    Safety

    Wet concrete is caustic. Wear gloves, eye protection and waterproof boots, and rinse skin that gets splashed.

    Skip the maths

    Our free concrete calculator works out the volume, bags and cost in feet or metres. If you are planning several jobs at once, the DIY Project Budget and Materials Planner combines materials, budget and a shopping list in one Excel file.

    These are planning estimates. Confirm quantities with your supplier and follow local building rules and safety guidance.

  • How Much Grass Seed Do I Need? Rates per 1,000 sq ft and per m²

    A new 1,500 sq ft lawn sown with tall fescue needs about 11.5 lb of seed. That is 7 lb per 1,000 sq ft, plus 10% extra for the edges. In metric, most new lawns need 35 to 50 g of seed per m², so a 10 × 8 m garden (80 m²) needs about 3 to 4 kg.

    How much you need depends mainly on the type of grass. A small-seeded grass like Kentucky bluegrass needs far less by weight than a large-seeded one like ryegrass or tall fescue. Here are the usual rates and how to use them.

    Seeding rates by grass type

    These are typical rates for sowing a new lawn on bare soil. Overseeding a thin lawn uses about half as much.

    Grass typeNew lawn (lb per 1,000 sq ft)New lawn (g per m²)Overseeding
    Kentucky bluegrass2–310–151–1.5 lb
    Fine fescues3–515–252 lb
    Tall fescue6–830–403–4 lb
    Perennial ryegrass6–930–453–4 lb
    Bermuda (hulled)1–25–101 lb
    Typical UK or AU lawn mix7–1035–5015–25 g/m²

    Always check the bag. Seed companies print their own rate, and coated seed can need more by weight because the coating adds weight but no extra seeds.

    Handy conversion: 1 lb per 1,000 sq ft is about 4.9 g per m².

    How to work it out

    1. Measure the lawn area. For a rectangle, multiply length by width. Split odd-shaped lawns into rectangles and triangles and add them up. For a circle, use 3.14 × radius × radius.
    2. Pick the rate for your grass type from the bag or the table above.
    3. Multiply. Area ÷ 1,000 × rate gives pounds. In metric, area in m² × rate in g gives grams.
    4. Add 10% for the edges, for any spots you go over twice, and for a little seed kept back to patch bare spots later.

    Worked example (US): A 50 × 30 ft lawn is 1,500 sq ft. With tall fescue at 7 lb per 1,000 sq ft, that is 1.5 × 7 = 10.5 lb. Add 10% and you need about 11.5 lb, so buy a 12 lb bag.

    Worked example (UK/Australia): A 10 × 8 m lawn is 80 m². At 40 g per m², that is 3.2 kg. Add 10% and you need about 3.5 kg.

    The DIYMeter grass seed and turf calculator does this for you, and also works out how much turf you need.

    Seed or turf?

    • Seed is much cheaper and gives you more choice of grass type. It takes 6 to 10 weeks before you can use the lawn properly, and it needs regular watering while it gets going.
    • Turf (sod) gives you a lawn straight away and you can walk on it lightly after 2 to 3 weeks. It costs several times more than seed.

    UK turf is usually sold in 1 m² rolls. In the US and Canada, sod is sold in pieces or on pallets that typically cover 400 to 500 sq ft. Order 5% more than the lawn area so you can cut it to fit curves and edges.

    Get the soil right first

    Seed does best on a firm, level bed of loose topsoil. If you are starting on subsoil or builder’s rubble, spread 4 to 6 inches (10 to 15 cm) of topsoil first. Our guide to how much topsoil you need for a new lawn covers the quantities.

    When to sow

    • Cool-season grasses (fescues, ryegrass, bluegrass): early autumn is best, while the soil is still warm. Mid-spring is the next best time. This applies to most of the northern US, Canada and the UK.
    • Warm-season grasses (Bermuda, zoysia, buffalo, couch): late spring to early summer, once the soil is reliably warm. This applies to the southern US and much of Australia.

    Common mistakes

    • Sowing too thickly. Doubling the rate doesn’t give you a thicker lawn. The seedlings crowd each other out and are more likely to get disease.
    • Sowing it all in one direction. Split the seed in half, sow one half lengthways and the other half across. This avoids stripes and bare patches.
    • Letting it dry out. Keep the top layer of soil damp until the grass is about 2 inches (5 cm) tall. That often means watering lightly once or twice a day.

    FAQs

    How long does grass seed take to germinate? Ryegrass comes up in about 5 to 10 days. Fescues take 7 to 14 days and bluegrass can take 14 to 30 days.

    Can I just throw seed on my existing lawn? It works much better if you mow short, rake out thatch and moss, and then seed. The seed needs to touch the soil.

    How long does a bag of grass seed last? Stored somewhere cool and dry, seed stays good for two to three years. After that, fewer seeds come up.

    Related: the DIY Project Budget & Materials Planner turns your measurements into quantities, costs and a shopping list.

  • How Many Rolls of Wallpaper Do I Need?

    A 4 × 3.5 m room with 2.4 m high walls needs about 8 standard rolls of plain or small-patterned wallpaper. With a large pattern repeat it needs about 10 rolls. In the US, a 12 × 12 ft room with 8 ft walls needs about 8 double rolls.

    Wallpaper isn’t worked out from the wall area alone. You count how many full-height strips (“drops”) you need, and how many of those you can cut from each roll. This is the method decorators use, and it stops you running short halfway round the room.

    Quick answer: rolls by room size

    These figures are for standard rolls of 10.05 m × 0.53 m, 2.4 m wall height, no large pattern repeat, and doors and windows not deducted.

    Room sizePerimeterDrops neededRolls
    3 × 3 m12 m236
    3 × 4 m14 m277
    4 × 3.5 m15 m298
    4 × 4 m16 m318
    4 × 5 m18 m349
    5 × 5 m20 m3810

    The 10.05 m × 0.53 m roll is the standard size in the UK and Europe, and you will also find it in Australia and Canada. A roll covers about 5.3 m², but you never get all of that onto the wall.

    The drop method, step by step

    1. Measure the perimeter. Add up the length of every wall you are papering.
    2. Count the drops. Divide the perimeter by the roll width (0.53 m) and round up. A perimeter of 15 m ÷ 0.53 = 28.3, so you need 29 drops.
    3. Work out the drop length. Take the wall height, add about 10 cm for trimming at the top and bottom, and add one pattern repeat if there is one. Plain paper on a 2.4 m wall gives a drop of 2.5 m.
    4. Drops per roll. Divide the roll length by the drop length and round down: 10.05 ÷ 2.5 = 4.02, so you get 4 drops per roll. The leftover piece is too short to use.
    5. Rolls. Divide the drops needed by the drops per roll and round up: 29 ÷ 4 = 7.25, so buy 8 rolls.

    The DIYMeter wallpaper calculator runs these steps for you and takes the pattern repeat into account.

    What the pattern repeat does to your total

    The pattern repeat is printed on the label, often as a number with an arrow, such as 53 cm or 64 cm. Every drop has to start at the same point in the pattern, so you lose part of a repeat with each cut.

    Take the same 4 × 3.5 m room with a 64 cm repeat. The drop becomes 2.4 + 0.64 + 0.1 = 3.14 m. Only 3 drops fit in a 10.05 m roll, so you need 29 ÷ 3 = 9.7, which means 10 rolls. That is two more rolls than for plain paper.

    In the US: double rolls

    In the US, wallpaper is usually priced per single roll but sold in double rolls. A common American double roll is about 20.5 inches wide and 33 ft long, which is around 56 sq ft. Sizes vary between brands, so always check the label.

    Worked example (12 × 12 ft room, 8 ft walls):

    • Perimeter = 48 ft = 576 inches. 576 ÷ 20.5 = 28.1, so you need 29 drops.
    • Drop length = 96 in + 3 in trim = 99 in. A double roll of 396 in gives 4 drops.
    • 29 ÷ 4 = 7.25, so buy 8 double rolls. With a 21 in pattern repeat you only get 3 drops per roll, so you need 10 double rolls.

    Doors and windows

    Most decorators don’t take doors and windows off the total. You still need short pieces above and below them, and the spare paper covers mistakes. If a room has several large windows or a wide patio door, you can take off about half a roll for each one.

    Before you buy

    • Check the batch number. Every roll should have the same batch (lot) number. Colours vary slightly from one print run to the next, and the difference shows on the wall.
    • Buy one spare roll. It covers a cutting mistake, and you will have a matching piece for repairs later.
    • Feature wall only? Measure the width of that one wall and use the same drop method. A 3.5 m wall at 2.4 m high needs 7 drops, which is 2 rolls of plain paper.

    FAQs

    How many square metres does a roll of wallpaper cover? A standard roll is about 5.3 m². Once you allow for trimming and matching the pattern, plan on getting about 4.5 to 5 m² onto the wall.

    Do I need lining paper? On old, uneven or freshly plastered walls, lining paper gives a smoother finish and helps the wallpaper stick. Use the same drop method to work out how much you need.

    Should I paper the ceiling too? Ceilings are hard work and are usually just painted. If you do want to paper one, count the strips across the shortest side of the room.

    Related: the DIY Project Budget & Materials Planner turns your measurements into quantities, costs and a shopping list.

  • How Much Insulation Do I Need? R-Values, Square Footage and Bags

    For a typical 1,200 sq ft attic, you need enough insulation to cover 1,200 sq ft at your target R-value, plus about 5–10% extra for trimming and awkward corners. With R-30 batts that cover roughly 50 sq ft per bag, that’s around 25 to 26 bags. With blown-in insulation, you’d follow the coverage chart on the bag for your chosen R-value.

    The quantity always comes down to three things: the area you’re insulating, the R-value (or thickness) you’re aiming for, and the coverage printed on the product you buy. Here’s how to work each one out.

    Step 1: Measure the area

    For an attic or loft floor, measure the length and width of the space and multiply. A 30 ft × 40 ft attic is 1,200 sq ft. In metric, a 9 m × 12 m loft is 108 m².

    For walls, measure the length of each wall and multiply by its height. Then subtract large openings like doors and windows. A 12 ft wall that’s 8 ft high is 96 sq ft. Take off a 3 × 5 ft window (15 sq ft) and you’re left with 81 sq ft.

    Don’t subtract the joists or studs. Batts are sized to fit between framing at standard spacing (16 or 24 inches in North America, 400 or 600 mm elsewhere), and the coverage on the bag already allows for that.

    Step 2: Choose your R-value

    R-value measures how well insulation resists heat flow. The higher the number, the better it insulates. Australia and New Zealand use the metric R-value (m²K/W), and Canada often quotes RSI. These aren’t the same as US R-values: multiply an RSI or metric R-value by 5.68 to compare it with a US figure.

    Where you liveAttic / loft / ceilingWalls (new build)
    USA, warm southR-30 to R-49R-13 to R-15 (2×4)
    USA, cold northR-49 to R-60R-19 to R-21 (2×6)
    CanadaAbout R-50 (RSI 8.8) or more in most regionsR-22 to R-24 is common
    UK270 mm of mineral woolDepends on wall type
    AustraliaR4.0 to R6.0 (metric)R2.0 to R2.8 (metric)

    These are typical guidance levels from bodies like ENERGY STAR in the US and the Energy Saving Trust in the UK. Your local building code has the final say, so check it before you buy, especially for new builds and renovations that need sign-off.

    Already have some insulation? Measure how deep it is. If your attic has 3 to 4 inches of old fibreglass (roughly R-10), you only need to add enough to reach your target. In the UK, if you have 100 mm between the joists, you’d usually lay another 170 mm across the top to reach 270 mm.

    Step 3: Divide by the coverage on the bag

    Every pack of insulation lists how much area it covers. This is the number that turns your measurement into a shopping list.

    Bags needed = area to insulate ÷ coverage per bag, then round up.

    Example 1: Batts in an attic (USA)

    • Attic: 30 × 40 ft = 1,200 sq ft
    • Target: R-30
    • R-30 batts for 16-inch joists: about 50 sq ft per bag (check the label)
    • 1,200 ÷ 50 = 24 bags
    • Add about 5% for waste: 26 bags

    Example 2: Loft rolls (UK)

    • Loft: 9 × 12 m = 108 m²
    • Plan: 100 mm between the joists, then 170 mm laid across them
    • One 100 mm roll covers about 8 m², so 108 ÷ 8 = 13.5, round up to 14 rolls
    • One 170 mm roll covers about 5.5 m², so 108 ÷ 5.5 = 19.6, round up to 20 rolls
    • Roll sizes vary by brand, so always use the coverage printed on the pack you’re buying

    Example 3: Blown-in insulation

    Loose-fill bags come with a coverage chart. For each R-value, it tells you the depth to blow, and how many square feet one bag covers. As the R-value goes up, each bag covers less area.

    If the chart says one bag covers 40 sq ft at R-38, a 1,200 sq ft attic needs 1,200 ÷ 40 = 30 bags. Many home stores lend the blowing machine for free when you buy a minimum number of bags.

    How thick will it be?

    People often ask how deep R-38 or R-49 is. It depends on the material:

    MaterialApproximate R-value per inchDepth for R-38
    Fibreglass battsR-3.1 to R-3.4About 12 inches
    Loose-fill fibreglassR-2.2 to R-2.7About 14 to 17 inches
    Loose-fill celluloseR-3.2 to R-3.8About 10 to 12 inches
    Mineral wool battsR-3.3 to R-4.2About 10 to 11 inches

    Loose-fill settles a little over time, especially cellulose. The bag chart usually gives both an initial depth and a settled depth, so blow to the initial depth.

    Common mistakes

    • Squashing batts. Compressing insulation to fit a space lowers its R-value. If R-30 batts won’t fit under your floor boarding, use a thinner, denser product, or raise the boarding on loft legs.
    • Covering the eaves. Leave a clear gap at the edges of the attic so air can flow in from the soffit vents. Baffles (rafter vents) hold the gap open.
    • Burying light fittings. Recessed lights that aren’t rated for contact with insulation need clearance. Check the fitting, and use a cover or keep the gap the manufacturer specifies.
    • Forgetting the hatch. An uninsulated loft hatch leaks a surprising amount of heat. Glue a piece of rigid foam board to the back of it and add a draught strip.
    • Mixing up R-value systems. An Australian R4.0 ceiling batt is not the same as a US R-4. It’s closer to R-23 in US terms.

    Safety first

    Wear long sleeves, gloves, safety glasses and a dust mask (an N95 or FFP2 is a good choice) when handling fibreglass or mineral wool. Only walk on the joists or on boards laid across them, never on the ceiling plaster between them. In hot climates, work in the attic early in the morning, when it’s cooler.

    Work it out in seconds

    Our free Insulation Calculator does the maths for you. Enter your measurements in feet or metres and the coverage printed on your pack, choose one layer or two, and it gives you a shopping list with waste already included.

    Quick answer: measure the area, choose the R-value your climate needs, divide by the coverage on the bag and round up. Add 5–10% for cutting and corners, and you’ll rarely have to make a second trip to the store.

    Related: the DIY Project Budget & Materials Planner turns your measurements into quantities, costs and a shopping list.